Oak Brook Park
Scaffold Quantity: 130 tonnes
Optimum Scaffolding was appointed to deliver an independent access scaffold to support refurbishment works on a live student accommodation block.
The project required a safe and adaptable scaffold solution across multiple elevations, ensuring consistent access for roofing and external works within a live university environment.
Golden Lion
Scaffold Quantity: 25 tonnes + 34 tonnes of Kentledge
Optimum Scaffolding was appointed to design and install a temporary roof system to facilitate refurbishment works at The Golden Lion.
The project required full encapsulation of the structure to provide weather protection, ensuring internal works could progress uninterrupted while maintaining safety within a live public environment.
Winslow Close
Scaffold Quantity: 99 tonnes
Optimum Scaffolding was appointed to deliver a full perimeter access scaffold with five Haki stairtowers to support refurbishment works across a multi-elevation building.
The project required a safe, consistent access solution across varying building heights and rooflines, while maintaining operations within an active, occupied environment.
Liberty Place
Scaffold Quantity: 20 tonnes
Optimum Scaffolding was appointed to deliver a safe and compliant access solution for cladding replacement works on a commercial building with a curved façade.
The project required a tailored scaffold design to ensure full access could be maintained across the entire elevation while working in line with programme requirements.
Newman University
One of our valued long-term clients tasked us with an exciting project: building a large access scaffold for essential maintenance and inspection. With tight deadlines in place to align with the students' leave, we rose to the challenge to ensure everything was completed efficiently and on time.
Green Lane Bridge
This scaffold was set up to facilitate a series of essential repairs and thorough inspections, all while the road was fully closed to ensure safety and efficiency.
Lea & Perrins
We were contracted to design and install a heavy duty loading bay with a capacity of 6.5 tonnes for the installation of new plant equipment.
Rugby Baptist Church
Our team completed the construction of a large 1,152 m2 birdcage scaffold in just five days for restoration of this magnificent church.
Commonwealth Games
We were contracted to design and erect a 17m x 17m scaffold with a CI Sheet temporary roof to host events as part of the Commonwealth Festivals.
Sainsbury’s, Redditch
Our task was to design and install two Haki staircases along with a beamed bridge for access to the flat roof, all without disturbing the existing tiled roof.
Royal Mail, Hinckley
On this occasion vehicle access had to be maintained, whilst roof access for maintenance was required. We were contracted to design and installed this cantilevered scaffold also known as a gallows bracket.
Bradfield House
Once contracted we installed some 24 tonnes of scaffold over 2 days to help our client meet an extremely tight deadline. Erected for window maintenance.
Royal Mail, Leamington Spa
With no access from the ground possible a cantilevered drop lift scaffold was the only option to provide a platform for cladding replacement.
Queen’s Drive
This scaffold was erected for building restoration. 19 tonnes of material, completed in two days over a weekend to reduce disruption to the shop fronts.