Oak Brook Park

Scaffold Quantity: 130 tonnes

Optimum Scaffolding was appointed to deliver an independent access scaffold to support refurbishment works on a live student accommodation block.

The project required a safe and adaptable scaffold solution across multiple elevations, ensuring consistent access for roofing and external works within a live university environment.

Golden Lion

Scaffold Quantity: 25 tonnes + 34 tonnes of Kentledge

Optimum Scaffolding was appointed to design and install a temporary roof system to facilitate refurbishment works at The Golden Lion.

The project required full encapsulation of the structure to provide weather protection, ensuring internal works could progress uninterrupted while maintaining safety within a live public environment.

Winslow Close

Scaffold Quantity: 99 tonnes

Optimum Scaffolding was appointed to deliver a full perimeter access scaffold with five Haki stairtowers to support refurbishment works across a multi-elevation building.

The project required a safe, consistent access solution across varying building heights and rooflines, while maintaining operations within an active, occupied environment.

Liberty Place

Scaffold Quantity: 20 tonnes

Optimum Scaffolding was appointed to deliver a safe and compliant access solution for cladding replacement works on a commercial building with a curved façade.

The project required a tailored scaffold design to ensure full access could be maintained across the entire elevation while working in line with programme requirements.

Newman University

One of our valued long-term clients tasked us with an exciting project: building a large access scaffold for essential maintenance and inspection. With tight deadlines in place to align with the students' leave, we rose to the challenge to ensure everything was completed efficiently and on time.

Green Lane Bridge

This scaffold was set up to facilitate a series of essential repairs and thorough inspections, all while the road was fully closed to ensure safety and efficiency.

Lea & Perrins

We were contracted to design and install a heavy duty loading bay with a capacity of 6.5 tonnes for the installation of new plant equipment.

Rugby Baptist Church

Our team completed the construction of a large 1,152 m2 birdcage scaffold in just five days for restoration of this magnificent church.

Commonwealth Games

We were contracted to design and erect a 17m x 17m scaffold with a CI Sheet temporary roof to host events as part of the Commonwealth Festivals.

Sainsbury’s, Redditch

Our task was to design and install two Haki staircases along with a beamed bridge for access to the flat roof, all without disturbing the existing tiled roof.

Scaffolding

Royal Mail, Hinckley

On this occasion vehicle access had to be maintained, whilst roof access for maintenance was required. We were contracted to design and installed this cantilevered scaffold also known as a gallows bracket.

Scaffolding

Bradfield House

Once contracted we installed some 24 tonnes of scaffold over 2 days to help our client meet an extremely tight deadline. Erected for window maintenance.

Scaffolding

Royal Mail, Leamington Spa

With no access from the ground possible a cantilevered drop lift scaffold was the only option to provide a platform for cladding replacement.

Scaffolding

Queen’s Drive

This scaffold was erected for building restoration. 19 tonnes of material, completed in two days over a weekend to reduce disruption to the shop fronts.