Newman University
One of our valued long-term clients tasked us with an exciting project: building an access scaffold for essential maintenance and inspection. With tight deadlines in place to align with the students' leave, we rose to the challenge to ensure everything was completed efficiently and on time.
Green Lane Bridge
This scaffold was set up to facilitate a series of essential repairs and thorough inspections, all while the road was fully closed to ensure safety and efficiency.
Lea & Perrins
We were contracted to design and install a loading bay with a capacity of 6.5 tonnes for the installation of new plant equipmentoor of their factory. on the first fl
Rugby Baptist Church
Our team completed the construction of a 1,152 m2 birdcage scaffold in just five days for restoration of this magnificent church.
Burger & Sauce, West Brom.
We erected this independent scaffold with internal edge protection to facilitate the installation of the 14-meter-high extraction duct.
Sainsbury’s, Redditch
Our task was to design and install two Haki staircases along with a beamed bridge for access to the flat roof, all without disturbing the existing tiled roof.
Commonwealth Games
We were contracted to design and erect a 17m x 17m scaffold with a CI Sheet temporary roof to host events as part of the Commonwealth Festivals.
Bradfield House
Once contracted we installed some 24 tonnes of scaffold over 2 days to help our client meet an extremely tight deadline. Erected for window maintenance.
Royal Mail, Hinckley
On this occasion vehicle access had to be maintained, whilst roof access for maintenance was required. We were contracted to design and installed this cantilevered scaffold also known as a gallows bracket.
Queen’s Drive
This scaffold was erected for building restoration. 19 tonnes of material, completed in two days over a weekend to reduce disruption to the shop fronts.
Royal Mail, Leamington Spa
With no access from the ground possible a cantilevered drop lift scaffold was the only option to provide a platform for cladding replacement.
Newman University
This project contained 18 tonnes of scaffold erected inside the courtyard at a 60m walk from the HGV. We erected the scaffold over three days to make sure the maintenance could be completed and scaffold dismantled before the students return.
Fulford Heath Golf Club
Whilst closed for business the club contracted us to erected this independent scaffold for roofing works, minimising risk and distribution to their customers.
Avon Close
We were contracted to design and installed this perimeter scaffold with temporary roof and monarflex encapsulation. Providing this solution helps the contractor stick to their program regardless of weather conditions.
Neville Court
An active residential block of apartments, on this project the scaffolding was erected for roof maintenance.